Factory-direct distribution transformers & substations · Anqing, Anhui, China
WhatsApp & email: david@hengyuanpower.com · +86 187 5568 0508
Home › Products › KYN28A-12

KYN28A-12 metal-clad withdrawable switchgear

12 kV switchgear for the incoming and outgoing feeders of a 10 kV substation, with the interlocking and test documentation a project needs.

What it is

The switchboard between the transformer and the network

KYN28A-12 is a metal-clad, metal-enclosed withdrawable switchgear: the circuit breaker sits on a withdrawable truck, so it can be racked out for maintenance without exposing the busbar compartment. Each compartment is segregated, and the mechanical interlocks prevent the breaker being moved with the circuit live.

We build it together with the transformers and packaged substations on the same site, which means the interface dimensions, cable entries and protection settings are resolved before the equipment leaves the factory.

Switchgear and transformer production workshop

Specification

ParameterRange
ModelKYN28A-12 metal-clad withdrawable switchgear
Rated voltage12 kV
ConstructionMetal-clad, compartmented, withdrawable truck
InterlocksMechanical interlocking between breaker, earthing switch and compartment
Typical useIncoming and outgoing feeders, transformer feeders, busbar section
DocumentationType test report for the type, routine tests, drawings

Often ordered together with

Oil-immersed transformer

The transformer fed by the outgoing panel.

11 kV transformers →

Packaged substation

The same switchgear inside a walk-in enclosure.

European type →

Dry-type transformer

Indoor rooms where oil is not acceptable.

SCB14 →

KYN28A-12 questions

QuestionAnswer
Can it be supplied with the transformer as one package?Yes. It is normally built into the packaged substation, or supplied loose for site assembly.
Do you provide the type test report?Yes, for the type. Send the project standard and we will confirm the report matches it.
What is the MOQ?Quoted per project; switchgear is usually ordered with the transformers rather than on its own.
What are the payment terms?T/T 30% deposit, 70% before shipment; L/C at sight for tender orders.

Send the single-line diagram

We will confirm the panel arrangement, the breaker ratings and how it fits with the transformer.